Notice Text:
|
In accordance with Subsection 10.7.1 of WBI Energy Transmission, Inc.s (WBI Transmission) FERC Gas Tariff, Third Revised Volume No. 1 (Tariff), WBI Transmission is offering to any Shipper or potential Shipper the uncommitted firm transportation capacity detailed below. A Request/Bid for this capacity must be submitted within five (5) business days of this posting in accordance with the bidding procedures specified in Subsection 10.3 of the General Terms and Conditions of WBI Transmissions Tariff. Bidding will close at 5 pm (CST) five (5) business days following the electronic posting of such request. Pursuant to Subsection 10.7.6, a Request/Bid for the following capacity requires a ten (10) year minimum term.
Receipt Point No./Name/MDRQ 01051 NBPL-Glen Ullin (R) 9,000 MDRQ equivalent dkt per day
Delivery Point No./Name/MDDQ 01550 MDU-Minot Border 2,800 MDDQ equivalent dkt per day 01580 MDU-Minot A.F.B 4,200 MDDQ equivalent dkt per day
Line Section/Direction of Flow/MDDQ 2 East 2,000 equivalent dkt per day 7 North 2,000 equivalent dkt per day*
*Maximum volume of 2,000 equivalent dkt is dependent upon the selected delivery locations on Line Section 7. The selected delivery locations must be south of WBI Transmissions Minot Lateral Take-off.
|