Notice Text:
|
In accordance with Subsection 10.7.1 of WBI Energy Transmission, Inc.'s (WBI Transmission) FERC Gas Tariff, Third Revised Volume No. 1 (Tariff), WBI Transmission is offering to any Shipper or potential Shipper the uncommitted firm transportation capacity detailed below. A Request/Bid for this capacity must be submitted within five (5) business days of this posting in accordance with the bidding procedures specified in Subsection 10.3 of the General Terms and Conditions of WBI Transmission's Tariff. Bidding will close at 5 pm (CST) five (5) business days following the electronic posting of such request. Pursuant to Subsection 10.7.6, a Request/Bid for the following capacity requires a ten (10) year minimum term.
Receipt Point No./Name/MDRQ 01051 NBPL-Glen Ullin (R) - 1,677 MDRQ equivalent dkt per day
Line Section/Direction of Flow/MDDQ 2 East 5,600 equivalent dkt per day 2 East 1,100 equivalent dkt per day* 2 West 1,100 equivalent dkt per day*
7 North 5,600 equivalent dkt per day 7 North 1,100 equivalent dkt per day* 7 South 1,100 equivalent dkt per day*
1 West 1,100 equivalent dkt per day* 5 North 1,100 equivalent dkt per day* 6 North 1,100 equivalent dkt per day* 30 East 1,100 equivalent dkt per day*
Maximum volume of 6,700 equivalent dkt per day from NBPL-Glen Ullin (R) to delivery points on Line Section 7.
5,600 equivalent dkt per day from NBPL-Glen Ullin (R) to Line Section 7 (Path: LS 2-7)
* 1,100 equivalent dkt per day from NBPL-Glen Ullin (R) to Line Section7 (Path: LS 2-7) or 1,100 equivalent dkt per day from NBPL-Glen Ullin (R) to Line Section 7 (Path: LS 2-1-5-6-30-7).
|