Notice Text:
|
Planned maintenance is scheduled on Line Section 24 Cleveland – Mapleton between Valve 32.0 and Valve 42.4 Casselton Take-Off Valve. This maintenance is scheduled for Gas Day April 30, 2024 through Gas Day May 31, 2024.
All delivery points west of the Casselton Tharaldson Ethanol Take-Off including WBI Point ID’s 01799 (Tharaldson Ethanol-Casselton) and 01783 (MDU-Casselton-Soy) will be required to be supplied from west of the Take-Off. All delivery points east of the Casselton Take-Off Valve including WBI Point ID’s 01795 (NSP-Casselton Border) and 01817 (NSP-Casselton Border 2”) will be required to be supplied from WBI Point ID 01951 (VGT-Felton(R)).
For Gas Day April 30, 2024 WBI Point ID’s 01799 (Tharaldson Ethanol-Casselton) and 01783 (MDU-Casselton-Soy) will have 0 dkt/d of service. WBI is currently working with impacted farm tap customers.
For Gas Days April 30, 2024 through May 31, 2024 scheduled receipts from WBI Point ID 01951 (VGT-Felton) will be limited to the demand east of the Casselton Take-Off Valve.
The main-line between the east side of the Casselton Tharaldson Ethanol Take-Off to the west side of the Casselton Take-Off will be out of service.
Information will be updated in the event conditions change.
|